4 Tweets 7 reads Aug 24, 2023
Chandrayaan-3 Mission:
All activities are on schedule.
All systems are normal.
🔸Lander Module payloads ILSA, RAMBHA and ChaSTE are turned ON today.
🔸Rover mobility operations have commenced.
🔸SHAPE payload on the Propulsion Module was turned ON on Sunday.
Here is how the Lander Imager Camera captured the moon's image just prior to touchdown.
... ... and here is how the Chandrayaan-3 Rover ramped down from the Lander to the Lunar surface.
A two-segment ramp facilitated the roll-down of the rover. A solar panel enabled the rover to generate power.
Here is how the rapid deployment of the ramp and solar panel took place, prior to the rolldown of the rover.
The deployment mechanisms, totalling 26 in the Ch-3…

Loading suggestions...